Tinjauan Waktu Pelaksanaan Proyek Konstruksi Pembangunan Gedung Kantor Pramuka Kota Ambon Menggunakan Metode Network Planning
DOI:
https://doi.org/10.51135/manumatav11i2p122-129Keywords:
Construction Management, Network Planning, Critical Path Method (CPM), Project DelaysAbstract
References
Arifin, K. (2016). Analisa Waktu Pelaksanaan Proyek Konstruksi Dengan Variasi Penambahan Jam Kerja (Lembur) (Studi Kasus: Pekerjaan
Pembangunan Gedung Kantor Pelayanan Pajak Di Bantul, Diy). Yogyakarta
Badri, S. (1983). Dasar-Dasar Network Planning. Yogyakarta
Intan, S., Sapulette, W., & Soukotta, R. (2020). Analisa Keterlambatan Waktu Pelaksanaan Proyek Konstruksi Di Kota Ambon: Klasifikasi
Dan Peringkat Dari Penyebab-Penyebabnya. Jurnal Manumata, 6(01), 19-23
Nudja, K. (2016). Perencanaan Kebutuhan dan Penjadwalan Sumber Daya pada Pelaksanaan Proyek Konstruksi. PADURAKSA: Jurnal
Teknik Sipil Universitas Warmadewa, 5(2), 13- 23.
Nugraha, P., Natan, I., & Sutjipto, R. (1986). Manajemen Proyek Konstruksi 2. Surabaya Putra, R., Fatmawati, W., & Mas’idah, E. (2020).
Analisa Waktu Dan Biaya Proyek Konstruksi Pembangunan Gedung-Gudang Dan Kantor PT ABC Semarang Dengan Earned Value Analysis. Studi Literatur. Jurnal Ilmiah Universitas Islam Sultan Agung, 101-126
Sahuleka, Y. (2024). Analisis Kinerja Waktu Pada Pelaksanaan Pembangunan Gedung Kantor Bahasa Provinsi Maluku Menggunakan Metode
Earned Value. Ambon
Sutrisno, W., Beatrix, M., & Fatmawati, L. (2023). Analisis Percepatan Waktu dan Biaya pada Proyek Pembangunan Gedung Sekolah Dasar
Wachid Hasyim Kota Surabaya Menggunakan Metode Crashing. Jurnal Teknik Sipil, 16, 123- 130
Downloads
Published
Issue
Section
Citation Check
License
Authors who publish with this journal agree to the following terms:- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).