Tinjauan Waktu Pelaksanaan Proyek Konstruksi Pembangunan Gedung Kantor Pramuka Kota Ambon Menggunakan Metode Network Planning

Authors

  • Suryanto Intan Universitas Kristen Indonesia Maluku
  • Thobyhend J.M Sahureka Universitas Kristen Indonesia Maluku
  • Vemara M. Matitaputty Universitas Kristen Indonesia Maluku
  • Cheterina Melmambessy Universitas Kristen Indonesia Maluku

DOI:

https://doi.org/10.51135/manumatav11i2p122-129

Keywords:

Construction Management, Network Planning, Critical Path Method (CPM), Project Delays

Abstract

Building construction projects are complex activities that require good time management in order to be completed according to plan. The Ambon City Scout Office Building Construction is located at Jalan R.A. Kartini No. 28, Karang Panjang, Ambon City, with a contract value of Rp 5,684,000,000 and planned duration of 205 calender days. During implementation, the project experienced a 55-day delay. This study aims to review the project implementation time using the Network Planning method to determine the critical path and factors causing work delays.The research method employed is a quantitative descriptive approach with a case study design. The data used includes primary data in the form of project implementation schedules and secondary data in the form of contract documents and work progress reports. The analysis was conducted by compiling the project work network, determining the critical path, and evaluating the actual implementation time against the plan. The results of the analysis show that there were several tasks on the critical path that directly contributed to the project delay. The application of the Network Planning method can assist in project time control and serve as a basis for improving implementation planning in similar projects in the future.

References

Arifin, K. (2016). Analisa Waktu Pelaksanaan Proyek Konstruksi Dengan Variasi Penambahan Jam Kerja (Lembur) (Studi Kasus: Pekerjaan

Pembangunan Gedung Kantor Pelayanan Pajak Di Bantul, Diy). Yogyakarta

Badri, S. (1983). Dasar-Dasar Network Planning. Yogyakarta

Intan, S., Sapulette, W., & Soukotta, R. (2020). Analisa Keterlambatan Waktu Pelaksanaan Proyek Konstruksi Di Kota Ambon: Klasifikasi

Dan Peringkat Dari Penyebab-Penyebabnya. Jurnal Manumata, 6(01), 19-23

Nudja, K. (2016). Perencanaan Kebutuhan dan Penjadwalan Sumber Daya pada Pelaksanaan Proyek Konstruksi. PADURAKSA: Jurnal

Teknik Sipil Universitas Warmadewa, 5(2), 13- 23.

Nugraha, P., Natan, I., & Sutjipto, R. (1986). Manajemen Proyek Konstruksi 2. Surabaya Putra, R., Fatmawati, W., & Mas’idah, E. (2020).

Analisa Waktu Dan Biaya Proyek Konstruksi Pembangunan Gedung-Gudang Dan Kantor PT ABC Semarang Dengan Earned Value Analysis. Studi Literatur. Jurnal Ilmiah Universitas Islam Sultan Agung, 101-126

Sahuleka, Y. (2024). Analisis Kinerja Waktu Pada Pelaksanaan Pembangunan Gedung Kantor Bahasa Provinsi Maluku Menggunakan Metode

Earned Value. Ambon

Sutrisno, W., Beatrix, M., & Fatmawati, L. (2023). Analisis Percepatan Waktu dan Biaya pada Proyek Pembangunan Gedung Sekolah Dasar

Wachid Hasyim Kota Surabaya Menggunakan Metode Crashing. Jurnal Teknik Sipil, 16, 123- 130