Comparative Review Of Construction Cost Building Building Structure Of Steel With Concrete Concrete Building (Case Study: Laboratory Building And Forestry University Pattimura Ambon)

Authors

  • Ronald S Letelay Program Studi Teknik Sipil Fakultas Teknik Universitas Kristen Indonesia Maluku
  • Suryanto Intan Program Studi Teknik Sipil Fakultas Teknik Universitas Kristen Indonesia Maluku
  • W Sapulette Program Studi Teknik Sipil Fakultas Teknik Universitas Kristen Indonesia Maluku

DOI:

https://doi.org/10.51135/manumatav5i2p76-84

Keywords:

, Comparison, Cost, Steel Structure, Reinforced Concrete

Abstract

Planning a building construction required planners to design buildings that are economical and safe. Excess steel in a building construction that is faster workmanship. This is the basis for a cost comparison review between steel structure buildings and reinforced concrete buildings at the Pattimura Ambon Farm and Forestry Laboratory building, which initially uses reinforced concrete. The purpose of this plan is to design the Pattimura Ambon Laboratory of Animal Husbandry and Forestry Building with steel structure and to compare the cost between steel construction with which concrete is more efficient. The calculation of steel structures is referred to as the Load and Resistance Factor Design (LRFD) method and the American Institute of Steel Construction (AISC) to design steel profiles. Analyze unit price using SNI 2016 to calculate plan of cost budget of steel and concrete work. The results of steel construction planning at the Animal Husbandry and Forestry Laboratory building at Pattimura University in Ambon used WF steel profiles for beams and columns with steel profile dimensions (beam G1 = 350x175x7x11), (beam G2 = 450x200x9x14), (beam G3 = 500x200x10x16), (beam G4 = 600x200x11x17), (columns C1 = 250x250x9x14), and (column C2 = 200x200x8x12). The budget plan for steel works is more expensive than reinforced concrete work with a cost comparison of Rp. 17,733,486,159.06 for steel works and Rp. 12,457,237,584.44 for reinforced concrete work. The difference between the price of steel and reinforced concrete is Rp. 5,276,248,304.61 with a percentage price of 0.42%

References

Abie Surya, F. 2007. Perencanaan Pembangunan Gedung Kuliah dan Laboratorium 3 Lantai Jurusan Bahasa dan Sastra Inggris dan Jurusan Bahasa Indonesia dan Sastra Indonesia FBS UNNES. Universitas Negeri Semarang.

American Institute of Steel Construction. 1992. Load and Resistance Factor Design Volume I, Structural Members, Spesification & Codes (2^ndedition). Chicago : AISC Inc.

Badan Standarisasi Nasional. 2002. Tata Cara Perencanaan Struktur Baja untuk Bangunan Gedung (SNI-03-1729-2002).

Badan Standarisasi Nasional. 2002. Tata Cara Perencanaan Ketahanan Gempa untuk Bangunan Gedung (SNI-03-2002).

Badan Standarisasi Nasional. 1989. Tata Cara Perencanaan Pembebanan untuk Rumah dan Gedung (SNI-03-1727-1989).

Badan Standarisasi Nasional. 2012. Spesifikasi untuk Gedung Baja Struktural (SNI-03-1729-2012).

Charles G. Salmon, Jhon E. Jhonson. 1992. Struktur Baja : Desain dan Perilaku 1, Edisi ketiga. Gramedia Pustaka Utama. Jakarta.

Daftar Harga Bahan Bangunan dan Upah Kota Ambon 2016: Dinas Pekerjaan Umum, Ambon.

Khafis, M. 2009. Perencanaan Struktur Baja Pada Bangunan Tujuh Lantai Sebagai Hotel. Universitas Sebelas Maret. Surakarta.

Putri, Niken A. 2011. Perencanaan Struktur dan Rencana Anggaran Biaya Gedung Mall 3 Lantai. Universitas Sebelas Maret. Surakarta.

Gedung Sekolah 2 Lantai. Universitas Sebelas Maret.Rubiyanto. 2010. Perencanaan Struktur dan Rencana Anggaran Biaya (RAB)

Schodek, Daniel L. 1999. Struktur Edisi kedua. Jakarta : Erlangga.

Setiawan, A. 2008. Perencanaan Struktur Baja dengan Metode LRFD (SNI-03-1729-2002).

Sumarsono, P. 2010. Analisis Balok Struktur Portal Baja menggunakan Balok Komposit. Universitas Sebelas Maret. Surakarta.

Supriatna L, Budiono B. 2011. Struktur Komprasi Desain Bangunan Tahan Gempa. Bandung : ITB.

Downloads

Published

2020-02-11

Issue

Section

Articles