Analisis Kinerja Waktu Pada Pelaksanaan Pembangunan Gedung Kantor Bahasa Provinsi Maluku Menggunakan Metode Earned Value
DOI:
https://doi.org/10.51135/manumatav10i2p153-161Keywords:
Waves, Beach, Erosion, Sedimentation, InfluenceAbstract
Infrastructure development is one of the main indicators of a region's economic growth. One of the important infrastructures is the government office, which is the center of administration and community services. the construction of the Maluku Province Language Office Building with the Implementing Contractor PT. PRIMA KONSTRUKSI. which was agreed with a budget of Rp. 28,194,890,000.00 with the duration of project implementation from March 15, 2023 to December 31, 2023 or approximately for 10 months to build the Maluku Province Language Office Building. The purpose of this is to analyze the performance of the time and schedule of the (Lukas Mose et al., 2022)implementation of the Maluku Province Language Office Building Construction using the Earned Value Method. The method used in this study is the Earned Value Method of control used to control the time, schedule and performance of the project. by calculating indicators from the BCWP and BCWS values to obtain the Schedule variance value or (SV), Schedule performance index or (SPI) and Time Estimated or (TE) and calculating indicators from the BCWP and BCWS values to obtain the Schedule performance index value or (SPI) and Time Estimated or (TE).The results obtained at the project completion time based on Time Estimated (TE) are 44 weeks, so the project is 2 weeks late from the total planned project completion time of 42 weeks. And the Schedule Performance Index (SPI) value of 0.958 indicates that the project is experiencing a delay of 2 weeks from the total planned time of project completion of 42 weeks. And the Schedule Performance Index (SPI) value of 0.958 indicates that the project is 4.19% late from the original plan of 100.00% with a work realization of 95.81%.
References
(CERC), C. E. (1984). Shore Protection Manual .
Washington D.C.: US Army Corps of
Engineers.
(1997). Dalam I. Soeharto, Menajemen Proyek (hal.
.
Adinata, S., & Alfa, A. (2020). PENERAPAN METODE
KONSEP NILAI HASIL (EARNED VALUE
CONCEPT) PADA PROYEK
PENINGKATAN JALAN ASPAL DI
LOKASI F4 (SUNGAI SIRIH). Seloda
Mayang, 109-117.
Dipohusodo, I. (1996). Manajemen Proyek &
Konstruksi.Kanisius. Jogjakarta.
Garditjo, E. (2017). Pengendalian Jadwal dan Anggaran
Terpadu dengan Metode Earned Value Analisis
Pada PEkerjaan Konstruksi. UkaRsT, 19-26.
Hardiyatmo, H. C. (2007). Pemeliharaan Jalan Raya.
Yogyakarta: UGM Press.
Istimawan, & Dipohusodo. (1995). Menajemen PRoyek
dan Konstruksi Jilid I . Yogyakarta: Badan
Penerbit Kanisius.
Johannes, V., Sahureka, T. J. M., & Intan, S. (2023).
Pengaruh Penambahan Sikament-Nn Dan
Silica Fume Terhadap Kuat Tekan Beton SCC
(Self Compacting Concrete). Manumata, 9(I),
–163
Lukas Mose, V. Johannes, & Sahureka, Th. J. M. (2022).
Perbandingan kuat tekan beton degan
menggunakan agregat sungai desa tepa dan
pantai wati desa yatoke di pulau babar. Jurnal
Manumata, 8(1), 1–10.
Mahardho, F. T., Indriyani, R., & Wailuhu, Y. E. (2021).
Analisis Kinerja Waktu pada Proyek
Pembangunan Gedung Kampus II UIN Sunan
Ampel Surabaya. Jurnal Teknik ITS, 164-169.
Rahman, A. (2010). Manajemen Nilai Hasil pada Proyek
Konstruksi. Yogyakarta: Penerbit Andi.
Sobari, S., & Lutfi, M. (2018). Tinjauan Biyaya dan
Waktu Proyek South City Square LOT 2
Menggunakan Metode Earned Value. Jurnal
Universitas Muhamadiyah Jakarta , 1-7.
Soeharto, & imam. (1998). Manajemen Proyek: Dari
Konseptual Sampai Operasional. Edisi Kedua.
Jakarta: Erlangga.
Susanti, A., Setiawan, R., & Pratama, T. (2019). Analisis
Kinerja Jadwal dengan Metode Earned Value
Management. Jurnal Manajemen Proyek
Indonesia, 45-55.
Teknik Pantai. (1999). Dalam B. Triadmojo, Teknik
Pantai (hal. 119).
Triatmodjo, B. (1999). Teknik Pantai Abrasi di
Kabupaten Bengkalis. Yogyakarta: Betta Offset
.
Widiasanti, N., & Lenggogeni, A. (2013). Analisis
Kinerja Proyek Konstruksi dengan Metode
Earned Value. Jakarta: Universitas Indonesia
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).