Material Requirements of Construction Road Project Standard Bina Marga ( case study in Project Implementation Of Wetar Island Side Road Regional Regency Of MBD)

Authors

  • Novaly Stella Saapang Program Studi Teknik Sipil Fakultas Teknik Universitas Kristen Indonesia Maluku
  • Suryanto Intan Program Studi Teknik Sipil Fakultas Teknik Universitas Kristen Indonesia Maluku

DOI:

https://doi.org/10.51135/manumatav3i2p77-86

Keywords:

Material, Delay, Mathematical Modeling

Abstract

Southwest Maluku Regency is a new division, So a lot of sustainable infrastructure development is carried out by BPJN XVI Maluku and Maluku Utara, Such as the construction of the Road, In the development process there are some obstacles Including the unavailability of project material in the local area, So it must be taken from outside the island, On the other hand improper calculations also have an effect In continuity of work and result in job delays.

This study aims to make modeling in the form of mathematics, Which is appropriate to calculate the material requirements plan of a road construction project. The research was conducted by collecting data of material usage In the field of the Contractor and PPK Wetar Island , By specifying the dependent variable and the independent variable As well as tested Correlation then can be regressed by using softwere MINITAB 17. The results showed, the dependent variable (Y) is the use of materials in the field and the independent variable (X) is the quantity based on the contract. Based on the results of the analysis then the modeling for the calculation of material use on aggregate needs kelas S ; Y= -3.46+ 1.0964X†,  kelas A : Y= -146 + 1.09992Xâ€, “ kelas B ; Y= 26.8+ 1.0778Xâ€, “Lapis Pengikat – Aspal Cair  ; Y= -62+ 1.0858Xâ€, “ Lapis Perekat – Aspal Cair ; Y=  65.7+ 1.00010Xâ€, “ Lataston Lapis Aus Wearing Cource (HRS-WC) ; Y= 67.3+ 1.01266Xâ€, “  Lapis Pondasi ; Y= 67.6+ 1.01266Xâ€, “Bahan Anti Pengelupasan; Y= 76+ 1.0117Xâ€.

References

Bambang Sridadi, Pemodelan dan Simulasi Sistem, Bandung, 2009.

Direktorat Jenderal Bina Marga, Materials for Asphalt Pavements, Post Graduate Program on Highway Engineeting, ITB-Bandung, 1976.

M. Giatman, Ekonomi Teknik, Jakarta, Rajawali pers, 2011.

Fatima, Ima, dan Soemardi, Biemo, W, Studi Pemodelan Matematis Karakteristik Kurva Kemajuan Pekerjaan Konstruksi, Penelitian Departemen Teknik Sipil, ITB, 2005.

Hermiaty, Dessy, Pemodelan dan Analisis Proporsi Upah Tenaga Kerja pada Proyek Konstruksi, Tesis Magister Manajemen Konstruksi, UII, 2007

Hamirhan Saodang, Konstruksi Jalan Raya (Buku 2, perencanaan perkerasan jaln raya), Bandung, 2005.

Kodoatie, Robert, J “Analisis Ekonomi Teknikâ€, Andi, Yogyakarta, 2005.

Mulyono, Eduard, Pengembangan Model Optimasi Biaya Pada PenjadwalanProyek Linier, Tesis Magister Teknik Industri, ITB, 2003.

Sugiyono, Statistika untuk Penelitian, Bandung, 2010.

Walpole, R.E. Pengantar statistika. Edisi ke 3. Jakarta , 1995.

Saapang Salmon, Analisis Komposisi Sumber Daya Pada Pelaksanaan Proyek Konstruksi Jembatan Di Seram Utara, Tesis Magister Teknik Sipil, UKI-Paulus, 2012.