Analisa Perbandingan Rencana Anggaran Biaya Pembangunan Parapet Hulu Proyek Upgrading Cek Dam Rinjani Dan Kolam Retensi Dengan Menggunakan Metode BOW, SNI 2016 Dan AHSP 2022
DOI:
https://doi.org/10.51135/manumatav10i2p172-179Kata Kunci:
BOW, SNI 2016, AHSP 2022Abstrak
The Cost Implementation Budget Analysis explains that to improve efficiency and effectiveness in construction activities, a basic calculation tool for unit prices is needed, namely Construction Cost Analysis, which is a method of calculating unit prices for construction work to be detailed in the multiplication of building material indices and labor wages with building material prices and worker wage standards to complete each unit of construction work. The construction cost analysis known so far includes BOW (Bugerlijke Openbare Werken), SNI 2016, and AHSP 2022. Contractors usually make bid prices based on analyses that do not fully adhere to BOW, SNI 2016, or AHSP 2022. The research objective is to find out the cost budget estimate that is more economical from the calculation using BOW (Burgerlijke Openbare Werken), SNI 2016, and AHSP 2022 methods for the upstream parapet construction of the Rinjani Check Dam Upgrading Project and Retention Basin.Referensi
Ashworth, Allan. 1994. Perencanaan Biaya Bangunan. Jakarta: Gramedia Pustaka Utama.
Beton, P., Sesuai, K. D. A. N. K., Siswoyo, R. D., Ndun, S., Raha, A., & Wayan, L. (n.d.). Kajian Koefisien
Analisa Harga Satuan Karakteristik Dengan Menggunakan Material Batu, Pasir Ex Takari Dan Portland Cement (PC) Ex Kupang, 57– 67.
H. Djoko Susilo Adhy, M. (2004). Rencana Anggaran Biaya (Contruction Cost Estimate).
KAUTSAR, T. M. A. (2014). Rencana Anggaran Biaya. Perhitungan RAB Perbandingan Metode BOW, SNI Dan Kontraktor, 136 (1), 23–42.
KEMENPUPR. (2022). Bagian 2: Analisis Harga Satuan Pekerjaan (AHSP) Bidang Sumber Daya Air.
Mufaris, M. A., Prihesnanto, F., & Darma, E. (1994). Perbandingan Estimasi Anggaran Biaya Antara Bow , Sni Dan Metode Perhitungan Kontraktor Pada Proyek Rumah Susun (Rusun) Pulogebang Jakarta Timur, 1–18.
Mukomoko, J. A. 1985. Dasar-Dasar Penyusunan Anggaran Biaya Bangunan. Jakarta: Gaya Media Pratama.
Novel, F., Sompie, L. B. F., & Malingkas, G. Y. (2014). Perencanaan Biaya Dengan Menggunakan Perhitungan Biaya Nyata Pada Proyek Perumahan (Studi Kasus Perumahan Green Hill Residence). Jurnal Sipil Statik, 2 (2), 73-80.
Panita Teknis Bahan Konstruksi Bangunan dan Rekayasa Sipil, 2008, Analisa Biaya Konstruksi, Badan Standarisasi Nasional (BSN), Jakarta.
Pranata, A. A. (2011). Perbandingan Estimasi Anggaran Biaya Antara Metode. Proceeding PESAT, 4, 25–34.
Redaksi Bumi Aksara, 2003, Analisis BOW. Jakarta: Penerbit Bumi Aksara. Sastraatmadja, A. S. (1994). Analisa anggaran biaya pelaksanaan. Nova. Jakarta.
Soeharto, Iman. 1989. Manajemen Proyek: Dari Konseptual Sampai Operasional. Jakarta: Erlangga.
Rochmanhadi, 1986. Alat–Alat Berat dan Penggunaannya, Departemen Pekerjaan Umum, Badan Penerbit Pekerjaan Umum, Jakarta.
Rostiyanti, Fatena Susy, 2008 Alat Berat untuk Proyek Konstruksi, Penerbit Rineka Cipta, Jakarta.
Mukomoko, J. A., 2007. Dasar Penyusunan Anggaran Biaya Bangunan, Penerbit Gaya Media Pratama, Jakarta.
Unduhan
Diterbitkan
Terbitan
Bagian
Lisensi
Authors who publish with this journal agree to the following terms:- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).