Kajian Perbandingan Estimasi Biaya (Study Kasus Penawaran Pada Pekerjaan Preservasi Jalan Di Pulau Leti) Dengan Menggunakan Metode AHSP 2016 Dan AHSP 2022
DOI:
https://doi.org/10.51135/manumatav11i2p105-113Keywords:
AHSP 2016, AHSP 2022, Comparison AnalysisAbstract
Road maintenance work on Leti Island, Southwest Maluku Regency, funded by state budget, commenced in December 2022 and covers STA 0+000 to STA 8+500. This study aims to compare the budget cost estimates calculated using AHSP 2016 and AHSP 2022, considering revisions in unti price analysis guidelines. The comparison focuses on drainage, graded pavement, and asphalt pavement works at STA 2+850 – 4+800 and STA 5+550-7=750, totaling 4,150 m, incluiding 700 m of drainage at STA 4+800 – 5+500.
Based on AHSP 2016, the estimated cost for these works is IDR 26,298,081,195.42, while AHSP 2022 produces an estimate of IDR 26,222,776,527.20. The final recapitulation for four divisions shows a total of IDR 38,624,792,939.49 using AHSP 2016 and IDR 37,094,529,873.97 using AHSP 2022. The findings indicate that AHSP 2022 results in a more economical budget plan. This difference is influenced by lower labor, material, and equipment coefficient indices in AHSP 2022 compared to AHSP 2016, leading to greater overall cost efficiency.
References
Asnuddin, S., Tjakra, J., & Sibi, M. (2018). Penerapan Manajemen Konstruksi Pada Tahap Pengendalian Proyek.(Studi Kasus: Bangunan Laboratorium Fakultas Teknik Universitas Sam Ratulangi Manado). Jurnal Sipil Statik , 6 (11), 895-906.
Alami, N. (2021). Studi komparasi perbandingan rencana anggaran biaya antara metode analisa harga satuan pekerjaan (AHSP) dan standar nasional indonesia (SNI). Surya Beton: Jurnal Ilmu Teknik Sipil.
Asnuddin, S., Tjakra, J., & Sibi, M. (2018). Penerapan Manajemen Konstruksi Pada Tahap Pengendalian Proyek.(Studi Kasus: Bangunan Laboratorium Fakultas Teknik Universitas Sam Ratulangi Manado). Jurnal Sipil Statik , 6 (11), 895-906.
Belferik, R., Andiyan, A., Zulkarnain, I., Munizu, M., Samosir, JM, Afriyadi, H., ... & Prasetyo, A. (2023). Manajemen Proyek: Teori & Penerapannya . PT. Sonpedia Penerbitan Indonesia
DAULAY, FS (2023). PERHITUNGAN RENCANA ANGGARAN PROYEK (RAP) PADA PEKERJAAN PEMELIHARAAN BERKALA JALAN BRIGJEND KATAMSO KOTA SIBOLGA BERDASARKAN RAB PENAWARAN KONTRAKTOR CV. KARYA BARU (Studi Kasus) (Disertasi Doktoral, Fakultas Teknik, Universitas Islam Sumatera Utara).
Mawardi, E., Iskandar, I., Sutanto, H., Sulaiman, MS, & Hidayat, M. (2023). Analisa Perbandingan Anggaran Biaya Dengan Menggunakan Metode BOW, SNI, dan AHSP. Jurnal TESLINK: Teknik Sipil dan Lingkungan , 5 (1), 48-60.
Pramesti, HR, & Priyanto, B. (2023). Analisa produktivitas tenaga kerja dan harga satuan pekerjaan pada pekerjaan pasangan dinding bata ringan. Jurnal Teknik Sipil Bangunan Dan Transportasi , 7 (1), 38-45.
Perdana, LA (2018). Analisis Estimasi Biaya Konstruksi Menggunakan Analisis Harga Satuan Pekerjaan 2013 dan 2016.
Sari, KP, Arman, UD, & Ridwan, M. (2021). Analisis Perbandingan Rencana Anggaran Biaya Berdasarkan Metode Sni Dengan Perhitungan Kontraktor. Jurnal Teknologi Dan Sistem Informasi Bisnis , 3 (1), 240-246
Thenu, G., Manossoh, H., & Runtu, T. (2021). Analisis Harga Pokok Produksi Dengan Metode Full Costing Dalam Penetapan Harga Jual Pada Usaha Kerupuk Rambak Ayu. Jurnal EMBA: Jurnal Riset Ekonomi, Manajemen, Bisnis Dan Akuntansi , 9 (2).
Yanette, Y., Ing, TL, & Haris, S. (2010). Evaluasi Karakteristik Agregat untuk Dipergunakan Sebagai Lapis Pondasi Berbutir. Jurnal Teknik Sipil , 6 (2), 151-164.
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).