Kajian Perbandingan Estimasi Biaya (Study Kasus Penawaran Pada Pekerjaan Preservasi Jalan Di Pulau Leti) Dengan Menggunakan Metode AHSP 2016 Dan AHSP 2022

Penulis

  • Fajar K.A. Sasono Politeknik Negeri Ambon
  • L. M. Saleh Politeknik Negeri Ambon
  • Penina T. Istia Politeknik Negeri Ambon

DOI:

https://doi.org/10.51135/manumatav11i2p105-113

Kata Kunci:

AHSP 2016, AHSP 2022, Comparison Analysis

Abstrak

Road maintenance work on Leti Island, Southwest Maluku Regency, funded by state budget, commenced in December 2022 and covers STA 0+000 to STA 8+500. This study aims to compare the budget cost estimates calculated using AHSP 2016 and AHSP 2022, considering revisions in unti price analysis guidelines. The comparison focuses on drainage, graded pavement, and asphalt pavement works at STA 2+850 – 4+800 and STA 5+550-7=750, totaling 4,150 m, incluiding 700 m of drainage at STA 4+800 – 5+500.
Based on AHSP 2016, the estimated cost for these works is IDR 26,298,081,195.42, while AHSP 2022 produces an estimate of IDR 26,222,776,527.20. The final recapitulation for four divisions shows a total of IDR 38,624,792,939.49 using AHSP 2016 and IDR 37,094,529,873.97 using AHSP 2022. The findings indicate that AHSP 2022 results in a more economical budget plan. This difference is influenced by lower labor, material, and equipment coefficient indices in AHSP 2022 compared to AHSP 2016, leading to greater overall cost efficiency.

Referensi

Asnuddin, S., Tjakra, J., & Sibi, M. (2018). Penerapan Manajemen Konstruksi Pada Tahap Pengendalian Proyek.(Studi Kasus: Bangunan Laboratorium Fakultas Teknik Universitas Sam Ratulangi Manado). Jurnal Sipil Statik , 6 (11), 895-906.

Alami, N. (2021). Studi komparasi perbandingan rencana anggaran biaya antara metode analisa harga satuan pekerjaan (AHSP) dan standar nasional indonesia (SNI). Surya Beton: Jurnal Ilmu Teknik Sipil.

Asnuddin, S., Tjakra, J., & Sibi, M. (2018). Penerapan Manajemen Konstruksi Pada Tahap Pengendalian Proyek.(Studi Kasus: Bangunan Laboratorium Fakultas Teknik Universitas Sam Ratulangi Manado). Jurnal Sipil Statik , 6 (11), 895-906.

Belferik, R., Andiyan, A., Zulkarnain, I., Munizu, M., Samosir, JM, Afriyadi, H., ... & Prasetyo, A. (2023). Manajemen Proyek: Teori & Penerapannya . PT. Sonpedia Penerbitan Indonesia

DAULAY, FS (2023). PERHITUNGAN RENCANA ANGGARAN PROYEK (RAP) PADA PEKERJAAN PEMELIHARAAN BERKALA JALAN BRIGJEND KATAMSO KOTA SIBOLGA BERDASARKAN RAB PENAWARAN KONTRAKTOR CV. KARYA BARU (Studi Kasus) (Disertasi Doktoral, Fakultas Teknik, Universitas Islam Sumatera Utara).

Mawardi, E., Iskandar, I., Sutanto, H., Sulaiman, MS, & Hidayat, M. (2023). Analisa Perbandingan Anggaran Biaya Dengan Menggunakan Metode BOW, SNI, dan AHSP. Jurnal TESLINK: Teknik Sipil dan Lingkungan , 5 (1), 48-60.

Pramesti, HR, & Priyanto, B. (2023). Analisa produktivitas tenaga kerja dan harga satuan pekerjaan pada pekerjaan pasangan dinding bata ringan. Jurnal Teknik Sipil Bangunan Dan Transportasi , 7 (1), 38-45.

Perdana, LA (2018). Analisis Estimasi Biaya Konstruksi Menggunakan Analisis Harga Satuan Pekerjaan 2013 dan 2016.

Sari, KP, Arman, UD, & Ridwan, M. (2021). Analisis Perbandingan Rencana Anggaran Biaya Berdasarkan Metode Sni Dengan Perhitungan Kontraktor. Jurnal Teknologi Dan Sistem Informasi Bisnis , 3 (1), 240-246

Thenu, G., Manossoh, H., & Runtu, T. (2021). Analisis Harga Pokok Produksi Dengan Metode Full Costing Dalam Penetapan Harga Jual Pada Usaha Kerupuk Rambak Ayu. Jurnal EMBA: Jurnal Riset Ekonomi, Manajemen, Bisnis Dan Akuntansi , 9 (2).

Yanette, Y., Ing, TL, & Haris, S. (2010). Evaluasi Karakteristik Agregat untuk Dipergunakan Sebagai Lapis Pondasi Berbutir. Jurnal Teknik Sipil , 6 (2), 151-164.

Diterbitkan

2026-02-18